Airfield drain system installed at Stocker

FieldTurf, the company hired to install new turf at Stocker Stadium, is putting in the new liner and airfield drain system this week.

The airfield is the drain system is used to move water off of the turf while the liner us to help move the water to the drains along the edges of the field.

The turf was delivered but won't be installed for another few days.

The target date for completion is August 1st.



 
Comments are posted from viewers like you and do not always reflect the views of this station. powered by Disqus