Monument Road Bridge to be Replaced

By: Kieran Wilson Email
By: Kieran Wilson Email

Construction on the Monument Road Bridge where it crosses the Redlands Water Power Canal will begin tomorrow, the work will continue through April.

Plans to replace the bridge came after the state identified it as “functionally obsolete”. The new bridge will be wider and straightened out.

Motorists can use Broadway, South Broadway, and South Camp roads as detours.


You must be logged in to post comments.

Username:
Password (case sensitive):
Remember Me:
KKCO NBC 11 News
2531 Blichmann Avenue
Grand Junction, CO 81505

Station Phone: 970.243.1111
Business Fax: 970.243.1770
Newsroom Fax: 970.245.3793
News Tip & Contest Line: 970.255.8477
Copyright © 2002-2016 - Designed by Gray Digital Media - Powered by Clickability 37064129 - nbc11news.com/a?a=37064129
Gray Television, Inc.