Visible progress for Diverging Diamond Project

By: Alicia Gentile Email
By: Alicia Gentile Email

GRAND JUNCTION, Colo. (KKCO) Construction on the Diverging Diamond Project Interchange is making visible progress.

You can see beams in place as crews work on the interchange. As construction continues, there are some closures you should know about.

Traffic along Highway 6 between 22 Road and the I-70 Exit 26 Interchange will soon be shifted to the North side of the Highway onto new pavement.

The new set up will allow for construction of the South side of HWY 6 at the I-70 Interchange.

A few days prior to the traffic switch, message board signs will be posted to notify drivers of the exact date.


You must be logged in to post comments.

Username:
Password (case sensitive):
Remember Me:
KKCO NBC 11 News
2531 Blichmann Avenue
Grand Junction, CO 81505

Station Phone: 970.243.1111
Business Fax: 970.243.1770
Newsroom Fax: 970.245.3793
News Tip & Contest Line: 970.255.8477
Copyright © 2002-2016 - Designed by Gray Digital Media - Powered by Clickability 223847781 - nbc11news.com/a?a=223847781
Gray Television, Inc.